000 01244nam a2200229Ia 4500
001 IA_Before a sensitivity analysis in the two most important variables, total costs and total income, the project turned out to be more sensible to the decrease of the income by sales, supporting until a 15% and with a TIR of the 37.82%; on the other hand, the increase to the fixed and variable costs does not represent risks, since it was observed that until an increase of 30% it is continued obtaining a TIR of the 31.10%, being higher than the TRMA
002 ESTUDIO DE FACTIBILIDAD TECNICO-ECONOMICO PARA EL
008 220117s xx 000 0 und d
010 _a185965
530 _aDisponible en PDF
583 _a2 ej. imp. ; 1 ej. CD
650 _aEntrepreneurship
_9148030
650 _aFish production
_xMexico
_xChiapas
_9160828
650 _aIniciativa empresarial
_9148031
650 _aOreochromis niloticus
_9156628
650 _aProducción de peces
_xMéxico
_xChiapas
_9160829
700 _aPérez Pelayo, Fernando, asesor
_9163685
700 1 _aPonce Hernández, Pedro
_9147918
700 _aSalazar Bustos, Ma. del Socorro, asesor
_9142525
942 _cTESIS E87 2009
999 _c185965
_d185965